SINOENERGY supplied six 200kW generator sets powered by WP12NG engines, totaling 1.2MW of installed capacity. The system features:

  • Parallel control for synchronized generation

  • Modular layout for staged maintenance

  • Central controller with alarm history and remote monitoring

  • Gas pressure regulation and safety system

  • Designed for base load and peak shaving support

Performance & Feedback:
The system has been operational since May 2024, delivering a stable output with no major faults. Average conversion performance reaches 3.5 kWh per Nm³ of natural gas.

Plant engineers reported excellent system uptime, reduced maintenance costs, and significantly improved productivity due to stable energy availability.