SINO ENERGY 2×1500kW Natural Gas Power Station Installed in Orenburg, Russia

Our Solution:


SINOENERGY delivered two high-performance 1500kW generator sets powered by 20V160 gas engines. The complete solution included:

  • Dual-unit synchronization with master-slave control logic

  • Combined heat and power (CHP) interface reserved for future recovery

  • Full containerized enclosures designed for cold Russian winters

  • Redundant fuel pressure regulation system

  • PLC-based control panel with Russian-language HMI and SCADA

SINOENERGY also provided on-site installation guidance, grid load protection logic, and remote diagnostic access.

Performance & Feedback:
Commissioned in December 2023, the power station has since accumulated over 4,500 running hours with no major faults. The plant achieved an average fuel efficiency of 4.1 kWh per Nm³ of natural gas.

The customer emphasized their satisfaction with system reliability, automation level, and the low noise design of the enclosures, calling it "a model for future plant-wide energy transitions."



Post time: 2024-10-28